06 4012 5121
EN NL

Guide

Support beams and ceilings: agree the finished appearance early

If the structural solution includes a beam, you will also want to understand how the room will look. Coordinate the engineering design and desired ceiling finish early. A calculation alone does not define the visible finish.

Understand the visible space

Ask for a drawing showing the new ceiling level and any boxing. Consider junctions with walls, cupboards and doors. Do not assume that a required beam can be completely concealed within the existing floor.

Coordinate finishes and technical requirements

The structural design determines the beam and its connections. Applicable fire resistance and other building requirements may affect its lining. Ask the professionals involved to define the required construction before choosing finishes.

Define the extent of plastering and painting

Finishing boxing is different from refinishing the whole ceiling. Identify the area, junctions and whether painting is included. Discuss possible visible differences between existing and new finishes.

Check before concealed areas are closed

Agree which inspections and photographs are needed before the finish covers the work. Keep the relevant drawings and material information. Consult those records and the professional involved before later fixing anything to, or altering, the boxing.

Frequently asked questions

Can a beam always be completely hidden?

That cannot be promised in advance. It depends on the structure, available space and required connections and lining.

Will the ceiling be painted after installation?

Only if included in the quotation. Define structural work, boxing, surface preparation and painting separately.

Read more

Related services

Sources and review

Reviewed on .

IPLO — Omgevingsvergunning bij de technische bouwactiviteit ↗